Diameter Signaling Controller (DSC) Vendor List. 2020 Trends and Outlook; 2021 Trends and Outlook; 2019 Trends and Outlook; 2018 Trends and Outlook. Language installation on SAP systems – Step by Step. To use SAP with other languages, you must perform a language import or supplement (use transaction SMLT). Changes in the language environment usually require changes in the code page setup, which requires changes in some database tables and in the profile files. We specialize in cost effective implementation of ERP solutions including SAP. OCS provides infrastructure for the ERP solution including System Landscape design, development, project management, resource planning, requirements analysis and implementation.

User

The Outer Continental Shelf (OCS) Lands Act requires BOEM to award leases competitively, unless BOEM determines there is no competitive interest. On September 8, 2011, BOEM received an unsolicited request from the New York Power Authority (NYPA), Long Island Power Authority (LIPA), and Consolidated Edison (ConEd) for a commercial lease from NYPA. The proposal includes the installation of up to 194, 3.6 megawatt (MW) wind turbines, yielding a potential 700 MW of wind energy generation. A copy of the application is available below.

Sap Ocs Locked


Ocs

On Jan. 4 2013, BOEM issued a Request for Interest in the Federal Register under Docket ID: BOEM-2012-0083 to assess whether there are other parties interested in developing commercial wind facilities in the same area proposed by NYPA. In addition to inquiring about competitive interest, BOEM also sought public comment on the NYPA proposal, its potential environmental consequences, and the use of the area in which the proposed project would be located.

  • Public comments and indications of interest received can be viewed here.
  • BOEM received indications of interest from Fishermen’s Energy, LLC and Energy Management, Inc.

Call for Information and Nominations

After reviewing nominations of interest received in response to the Request for Interest, BOEM determined that competitive interest in the area proposed by NYPA exists, and initiated the competitive leasing process pursuant to 30 C.F.R. 585.211. Subsequently, on May 28, 2014, BOEM published a “Call for Information and Nominations” (Call) to seek additional nominations from companies interested in commercial wind energy leases within the Call area offshore New York (see map below). BOEM also sought public input on the potential for wind development in the Call Area, including comments on site conditions, resources, and existing uses of the area that would be relevant to BOEM’s wind energy development authorization process. Materials relating to the “Call” are below.

Proposed Sale Notice

BOEM published a “Proposed Sale Notice (PSN) for Commercial Leasing for Wind Power on the Outer Continental Shelf Offshore New York” in the Federal Register on June 6, 2016, which includes a 60-day public comment period ending on August 5, 2016.

Correspondence Referenced in the PSN

Final Sale Notice

On October 27, 2016, BOEM announced the publication of the Final Sale Notice (FSN) for a lease sale offshore New York and the availability of a revised environmental assessment for site assessment and site characterization activities in the area. The lease area is located 11.5 nautical miles (nm) from Jones Beach, NY. From its western edge, the area extends approximately 24 nmi southeast at its longest portion. The project area consists of 5 full OCS blocks and 143 sub-blocks. Materials related to the FSN are below.

On November 18, 2016, BOEM held a seminar to educate bidders on changes to the auction format announced in the Final Sale Notice. A recording of the seminar is available through this link: www.boem.gov/New-York-Auction-Education-Seminar/.

Commercial Leases

On December 15-16, 2016, BOEM held a lease sale (i.e., auction) for an area offshore New York, referred to as the “New York lease area.” The auction lasted 33 rounds. Statoil Wind US LLC, which bid $42,469,725 was the winner of lease area OCS-A 0512. A summary of the bidding results can viewed at: www.boem.gov/Bid-Summary-ATLW-6/.

The commercial wind energy lease was signed and executed by BOEM on March 15, 2017.

Environmental Review and Wind Energy Area Identification

BOEM published a Notice of Intent (NOI) to prepare an Environmental Assessment (EA) on May 28, 2014. The purpose of the EA is to determine whether there are significant impacts associated with issuing a lease, conducting site characterization surveys, and conducting site assessment activities (e.g., the installation of a meteorological tower and/or buoys) within the proposed area. Through the NOI, BOEM sought public input on the environmental and socioeconomic issues to be considered, as well as alternatives and mitigation measures. The NOI and public comments are provided below.

  • Public Comments Responding to NOI (July 2014)

On March 16, 2016, the Department of Interior announced that BOEM has identified a Wind Energy Area (WEA) offshore New York. Additional information about BOEM’s decision can be found below.

BOEM published an EA for a 30-day public comment period on June 6, 2016. In response to stakeholder requests, BOEM extended the public comment until July 13, 2016. BOEM will consider all comments received in determining whether to issue a Finding of No Significant Impact, or conduct additional analysis under NEPA.

Sap Ocs Locked By User With Transaction

  • Environmental Assessment (EA)

After reviewing comments received on the environmental assessment, BOEM decided to remove five aliquots (about 1,780 acres) from the WEA due to environmental concerns over sensitive habitat on Cholera Bank. In a comment letter, the National Marine Fisheries Service (NMFS) identified the Cholera Bank feature as a sensitive habitat to be avoided for the placement of site assessment structures. As a result of this removal, the revised lease area will be less than 2% smaller than the lease area considered in the initial environmental assessment and Proposed Sale Notice.

Visual Simulations

Sap Ocs Package Directory

BOEM has undertaken a project to develop visual simulations of a hypothetical wind energy facility on the Outer Continental Shelf offshore Long Island, New York. Additional information on the study can be found here.

Sap Ocs Locked By User

Site Assessment

On November 21, 2018, BOEM approved the Site Assessment Plan (SAP) for lease OCS-A 0512 submitted by Equinor Wind US LLC. The SAP approval allows for the deployment of two RPSTM Floating Light Detection and Ranging (FLiDARs) buoys, one RPSTM Met and Wave buoy, and one subsea Current Meter mooring.

Lease OCS-A-0512: Equinor Wind US LLC (f/k/a Statoil Wind US LLC) submitted a Site Assessment Plan (SAP) to BOEM in June, 2018, with revisions filed in July, August and October, 2018. BOEM determined the SAP was complete on August 22, 2018. BOEM will review the SAP and approve, disapprove, or approve with modifications the proposed site assessment activities. The SAP is available here: